Answer:
<em>Worker B needs 9 days to finish the rest of the work</em>
Step-by-step explanation:
<u>Proportions</u>
Worker A finishes a project on his own in 12 days and worker B does the same in 16 days.
Worker A does 1/12 of the project in one day and worker B does 1/16 of the project in one day. When working together, they do

After 3 days they have completed:

parts of the project, this means it still remains:

parts of the project and it is done by B alone. Since B does
per day, he now takes

days to complete the project.
Worker B needs 9 days to finish the rest of the work
Step-by-step explanation:
<h3>
Need to FinD :</h3>
- We have to find the measures of other two angles of triangle.

We know that,
- The other two angles of triangle are in the ratio of 3 : 14. So, let us consider the other two angles of the triangle be 3x and 14x.
Angle sum property,
- The angle sum property of triangle states that the sum of interior angles of triangle is 180°. By using this property, we'll find the other two angles of the triangle.


∴ Hence, the value of x is 10°. Now, let us find out the other two angles of the triangle.

Second AnglE :
∴ Hence, the measure of the second angle of triangle is 30°. Now, let us find out the third angle of triangle.

Third AnglE :
∴ Hence, the measure of the third angle of the triangle is 140°.
Answer:
Option b) is correct.
The completed factor of given expression is 
Step-by-step explanation:
Given expression is 
To find the completed factor for the given expression:
:
Taking the common number "2" outside to the above expression we get

Now rewritting the above expression as below
(since 16 can be written as the number 2 to the power of 4)

The above expression is of the form 
Here
and 
Therefore it becomes

The above expression is of the form 
Here
and 
Therefore it becomes
Therefore
Option b) is correct.
The completed factor of given expression is 