<em>so</em><em> </em><em>the</em><em> </em><em>right</em><em> </em><em>answer</em><em> </em><em>is</em><em> </em><em>of</em><em> </em><em>option</em><em> </em><em>A</em><em>.</em>
<em>Hope</em><em> </em><em>this</em><em> </em><em>will</em><em> </em><em>help</em><em> </em><em>u</em><em>.</em><em>.</em><em>.</em>
, Two triangles are similar. Triangle ABC has side lengths of AB = 10, BC = 6, CA = 7. Triangle XYZ has a side length of XY = 8. Find YZ.
Given parameters:
First sets of staircase = 
Next sets =
Third sets = 
Unknown:
The least possible number of steps =?
Solution:
The least possible number of steps will be the lowest common multiples of these sets of steps.
We want fractions that will give whole numbers because realistically, one cannot take half a step of a step.
So, the number of steps must be a multiple of denominators of the fractions given.
Denominators are 2 , 3 and 8
Their least common multiple is 24;
This the lowest number by which 2, 3 and 8 can all divide.
So, the least number is 24 steps
9514 1404 393
Answer:
c. $20.23
Step-by-step explanation:
The overhead cost per labor hour is found by dividing overhead costs by labor hours:
$163,900/(8100 h) = $20.23 /h
The factory overhead rate is $20.23 per labor hour.