To solve this, we need to understand Slope Intercept Form (SIF), as well as how to graph a line.
SIF is the standard equation of lines on graphs. It is "y=mx+b" where m is the slope and b is the y-intercept. The y-intercept is the value of y when x is 0.
To find the y-intercept (which we will need to form the equation), we should simply graph the line. This will let us visualize the y-intercept, and overall make it easier to understand.
To graph a line, we should start with the point we have (that being (3, 3)) and follow the slope with rise/run. This means in this case, we will go right 2 for every 1 up, or 2 left for every 1 down.
Below I have attached a graph to help you see how to graph this, which we will get our equation from. The highlighted area is our y-intercept. The red circle shows our original point (3,3), and the blue dots show our slope.
Using the graph, we can see the equation for this line is
y=1/2x+1.5.
Answer:
Step-by-step explanation:
Maximum capacity of the elevator = 2000 pounds
Combined weight of the elevator = 428 pounds
A). Let the possible weights that can be added to the elevator = w pounds
B). Therefore, inequality representing this situation will be,
428 + w < 2000
C). By solving the given inequality,
(428 + w) - 428 < 2000 - 428
w < 1572 pounds
Now we draw this inequality on a number line.
Answer:
x2 = -0.600000
x3 = -0.521600
Step-by-step explanation:
Given the formula;
xn+1 = (xn)³-5/10
x2 = (x1)³-5/10
Given x1 = -1
x2 = (-1)³-5/10
x2 = (-1-5)/10
x2 = -6/10
x2 = -0.600000
x3 = (x3)³-5/10
Given x3 = -0.6
x3 = (-0.6)³-5/10
x3 = (-0.216-5)/10
x3 = -5.216/10
x3 = -0.521600
its 50.3.2 tags: c c c cc cc c c c c ar c free car no yes show two plus pwe
Answer:
Step-by-step explanation:
If Daniel does 1/9 of the job in one hour
let x = Paul's rate
Paul does 1/x of the job in one hour
They both do the job in 4.95hrs
(1/9)(4.95) + (1/x)(4.95) = job completion
multiply both sides by 9x
(9x)(1/9)(4.95) + (9x)(1/x)(4.95) = 9x(1)
4.95x + 9*4.95 = 9x
4.95x + 44.55 = 9x
9x - 4.95x = 44.55
4.05x = 44.55
x = 44.55/4.05
x = 11 hours i.e time it takes for Paul to pick the 40 bushels alone