Hi there
The formula of the future value of simple interest is
A=p (1+rt)
A future value?
P principle 750
R interest rate 0.09
T time 5years
So
A=750×(1+0.09×5)
A=1,087.5
Good luck!
Answer: You start to ascend
Explanation:
Since you are walking due south and the positive y-axis points north, the y-coordinate decreases.
Let

= y-coordinate after walking due south

= z-coordinate (or the height) after walking due south
So, the point where you stand after walking due south has a coordinate of

. Moreover,

Since the y-coordinate decreases after walking due south and

,

So, the height after walking due south exceeds 1,206 meters, which is the previous height before walking due south. Therefore, if you walk due south from point with coordinates (100, 120, 1206), you are ascending.
Answer:
78 is 7 divided by 8, which equals 0.875. So an equivalent fraction is another fraction that also equals 0.875.
Answer: 54
<u>Step-by-step explanation:</u>
replace "a" with "-2" in the g-equation
g(a) = a² - 4a + 42
g(-2) = (-2)² - 4(-2) + 42
= 4 + 8 + 42
= 54
Answer:
2
Step-by-step explanation:
132+10+2=144