A T.V was bought for N1,250 and sold for N1,000. Find the percentage loss?

Mathematics
2 answers:
g100num [7]3 years ago
8 0

Answer:

20

Step-by-step explanation:

1250 divided by 100 is 12.5

12.5*80 equals 1000 so 100-80 equals 20%

Troyanec [42]3 years ago
6 0

Answer:

20%

Step-by-step explanation:

1000/1250=0.8

1000 is 80% of the original price

therefore the percentage loss is 20%

You might be interested in
Solve the systems of equations by substitution<br> 3/8x + 1/3y = 17/24<br> X + 7y = 8
Sedaia [141]

Answer:

If your solving for y...

The answer would be: y = -9/8x + 17/8 I believe.

For the second one... it would be : y = -1/7x + 8/7

Step-by-step explanation:

8 0
2 years ago
Read 2 more answers
Thanks this answer really helped I got %100 on my test
Rzqust [24]
I don’t understand if this is a math problem or a statement.
3 0
2 years ago
Read 2 more answers
Which types of triangles can be formed by taking the cross section of a rectangular prism lowly eh one shown above
kolezko [41]
I think the answer is a
8 0
3 years ago
Read 2 more answers
A crew will arrive in one week and begin filming a city for a movie. The mayor is desperate to clean the city streets before fil
Reptile [31]

Step-by-step explanation:

1 week = 7 days of 24 hours each = 7×24 = 168 hours.

the first team can do 1/700 of the total work per hour.

the second team can do 1/600 if the total work per hour.

if they work together, then 1/700 + 1/600 of the total work can be done per hour.

to add these 2 fractions we need to bring them to the same denominator. and that would be 4200 (LCM of 700 and 600).

1/700 + 1/600 = 6/4200 + 7/4200 = 13/4200

so, together, they can do 13/4200 if the total job in 1 hour.

how many hours will they need together to finish the job ?

well, how often does 13 fit into 4200 (as 4200/4200 is the complete job) ?

4200 / 13 = 323.0769231... hours

so, it will still take a little bit over 323 hours to clean all the streets.

but there are only 168 hours until the film crew starts.

so, no, there is not enough time.

4 0
2 years ago
The large rectangle below represents one whole.
Sonja [21]

Answer:

40%

Step-by-step explanation:

<h3>so have 5 rectangles in a whole.</h3><h3>we also have 2 shaded potions in that whole which represents 2/5 shaded potions.</h3>

<h3>2/5 in fraction =0.4</h3>

<h3>Now Change 0.4 to percentage by multiplying 0.4 by 100</h3>

<h3>0.4 x 100 = 40</h3><h3>Therefore the percentage represented by the shaded area is 40%</h3><h3> </h3><h3>Hope this helps.</h3><h3>Good luck ✅.</h3>
5 0
2 years ago
Other questions:
  • Is this work correct? If not please tell me what is and how to correct the problem. ❤️
    10·2 answers
  • How do I find the x-Interception of -2(8+3)^2 +8
    11·1 answer
  • Help me please I need help so bad
    12·1 answer
  • LOTS OF POINTS MATH QUESTION
    12·2 answers
  • Which of the following linear equations passes through points (-1, 5) and (1, -5)?
    13·1 answer
  • Determine the number of solutions for the system 6x+9y=9 amd -6x+6y=1
    14·1 answer
  • Marisa is alway)s looking for a great deal while shopping . She found a sale rack where all of the jeans are marked 40% off . He
    6·2 answers
  • One inch equals 2.54cm.A ribbon 100in.long is how many cmlong?​
    12·2 answers
  • Trains Two trains, Train A and Train B, weigh a total of 265 tons. Train A is heavier than Train B. The
    6·1 answer
  • 10 points + BRAINEST
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!