1500 cans / 3 workers = 500 cans per worker.
1 worker makes 500 cans in 4 days.
4 workers x 500 cans = 2000 cans in 4 days.
2000 x 2 = 4000 cans, 4 days x 2 = 8 days.
It will take 8 days.
Answer:
A = (x + 7)(x + 9)
Step-by-step explanation:
Let the width w = x
then length l = w + 4 = x + 4
Area = length x width
= x(x+4)
Then the the width is increased by 7 units and the length increased by 5 units.
w = x + 7
l = (x + 4) + 5 =x + 9
A = (x + 7)(x + 9)
Answer:
It is the third answer.
Step-by-step explanation:
It is the third answer because when you look at the equation it is 5x is greater then negative 5 so that means it’s the 3rd answer hope this helped!
The equation would be -9+-9 = -18