Answer:
the answer is 1760
Step-by-step explanation:
Answer:
3% is 300 in intrest
6% is 600 in intrest
4% is 400 in intrest
Step-by-step explanation:
There's a really easy way to convert any units to other units.
Right now, we have the fraction (4 miles) / (2 hours).
We want to find a fraction that's exactly equal to that one,
but has the units of (miles/minute) or maybe (feet/minute).
Just take the original fraction, and multiply it by some other
fractions.
Each fraction you multiply it by must have the value of ' 1 ' so
you don't change the value of the original fraction. But it can
have different units, that cancel with other units to eventually
give you the units you want.
(4 miles / 2 hours) times (1 hour / 60 minutes)
The second fraction is equal to ' 1 ', because the top and the bottom
have the same value ... 1 hour is the same thing as 60 minutes.
Multiply the fractions: (4 miles x 1 hour) / (2 hour x 60 minutes)
Now you can cancel 'hour' from the top and the bottom, and you have
(4 miles x 1) / (2 x 60 minutes)
= (4 miles) / (120 minutes)
= (4 / 120) mile/minute = 0.0333... mile / minute .
Let's do it again, go a little farther, and get an answer that
might mean more and feel more like an answer.
(4 miles) / (2 hours) x (5280 feet / mile) x (1 hour / 60 minutes)
The 2nd and 3rd fractions both have the value of ' 1 ', because
the top is equal to the bottom.
Multiply all three fractions:
(4 miles x 5280 feet x 1 hour) / (2 hours x 1 mile x 60 minutes)
You can cancel both 'mile' and 'hour' out of the top and bottom,
and look what you have left:
(4 x 5280 feet x 1) / (2 x 1 x 60 minutes)
= (4 x 5280) / (2 x 60) feet / minutes
= (21,120 / 120) feet/minute = 176 feet per minute
To get perimeter, you simply add all the side lengths. So we will ad 23.2 + 23.2 + 12 + 12 = 70.4
The perimeter is 70.4 m
First, find out how much each man works. If eight men take 10 days to build 150 m of wall, then that means that it takes 80 man days to build 150 m. One Man day is then 150÷80, in other words 1.875. If eight men have already been working for six days, then they have spent 8×6 man days, 48. 48 men days times 1.875 m of wall per man day equals 90 m of wall have been built. So, you have four days left to build the remaining 60 m of wall as well as 45 extra meters, in other words, 105 m total. 105 m divided by four days equals 26.25 m need to be built every day. Since one man builds 1.875 m of wall every day, to find the number of men total you need for the last four days, take 26.25÷1.875, Which equals 14 exactly. 14 is not the answer however, because it’s asking how many more men you need. Since you already have eight, you need six more to make 14
The answer is six more men