Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
Answer:
Step-by-step explanation:
now the equation looks like
3-4Cos(x)=y
hmmm i'm wondering if you can figure it out from here??? it's the same as the other two.. plug in that
/2 .. can you? :)
Answer:
m=5
Step-by-step explanation:
c=30m+50
c=20m+100
substitute
20m+100=30m+50
like terms
100-50=30m-20m
50=10m
m=5
If you would like to solve the equation x + 1/6 = 6, you can do this using the following steps:
x + 1/6 = 6 /-1/6
x + 1/6 - 1/6 = 6 - 1/6
x = 6 - 1/6
x = 36/6 - 1/6
x = 35/6
x = 5 5/6
The correct result would be C. x = 5 5/6.
The sum is 10s^2t-5st^2. With two separate sections it’s a binomial, and the sum of the powers of the variables is 2+1=3, it has a degree of 3.