10.5 pounds is the answer to the question
Ok first you have to figure out the amount of cans produced in a minute by the machines. So do 7200 divided by 200 and 7200 by 300 to get 36 Cans per minute on the new machine and 24 Cans per minute on the old one. So now we need to figure out an equation to figure out the amount of time needed to make 7200 cans with them working together which means addition. The equation will be 36x+24x=7200 which can be simplified to 60x=7200 and your answer for total amount of time will be in minutes. You should get 120 minutes.
Answer:
90 Degrees
Step-by-step explanation:
<LMN is an interior angle whose measure is equal to one-half the measure of its intercepted arc. Since the intercepted arc LN is the diameter of the circle, its measure is 180 degrees, so m<LMN = 90.
The median is the number in the middle of a list of numbers.
Since this list has an even amount of numbers, you take the 2 middle numbers, add it together, and divide by 2 to get the average value.
The middle values are 17 and 20, so you do:
17 + 20 = 37 now divide by 2
37/2 = 18.5