1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Lilit [14]
3 years ago
6

What are screenshots helpful for ?

Computers and Technology
2 answers:
alex41 [277]3 years ago
4 0

A

Creating.

Explanation:

What else would they be used for

Ber [7]3 years ago
3 0
Creating documentation
You might be interested in
What the meaning of ethics
insens350 [35]
Ethics is a system of moral principles and is concerned with what is good for individuals and society and is also described as moral philosophy.
3 0
3 years ago
a flow chart is the _______ representation of the sequence of steps required of steps required to solve a particular problem​. I
Eddi Din [679]

Answer:

A flowchart is simply a graphical representation of steps. It shows steps in sequential order and is widely used in presenting the flow of algorithms, workflow or processes. Typically, a flowchart shows the steps as boxes of various kinds, and their order by connecting them with arrows.

7 0
3 years ago
The ____ is the period of time within which systems, applications, or functions must be recovered after an outage. Select one:
scZoUnD [109]

Answer:

c. recovery time objective                                                  

Explanation:

  • Recovery time objective (RTO) is the maximum acceptable duration permitted between an unfortunate loss or failure and the restoration of normal operations and services.
  • According to the RTO, the systems, applications or operations must be restored within a targeted time period after a disaster, to avoid unacceptable outcomes of the disruption.
  • So a business process must be recovered within this period of time.
  • It measures how much a failure affects the normal operations, applications and systems and RTO is measures in time units like seconds minutes hours or days.
  • In simple words RTO refers to the time you need to restore system, applications and data.
  • For instance a 2-hour RTO refers to restore and get operations or services back to running within 2 hours of the service failure or outrage.
6 0
3 years ago
Assume the variable costOfBusRental has been declared as an int and assigned the amount that it costs to rent a bus. Also assume
Basile [38]

It’s a total price divided to a number of riders involved. So costPerRider = costOfBusRental/maxBusRiders

4 0
3 years ago
Critical Thinking Questions
Hoochie [10]

Answer:

One example of syntax in Logo is “[”. Two examples of Java are “;” and “{“or “}”. If you don’t use these parts of syntax then you could get a Syntax error, this will make you have to stop the code and debug.

Explanation:

6 0
2 years ago
Read 2 more answers
Other questions:
  • Don't pat any attention to this
    7·2 answers
  • One of the ways to create a horizontal navigation menu from an unordered list is to a. set the display property of the element w
    6·1 answer
  • Drag each label to the correct location on the image.
    10·1 answer
  • ___MSDS provides information on how to handle, store, discard and care for potentially hazardous chemicals. true or false?​
    5·1 answer
  • A type of multiprocessor chip that provides two or more separate and independent CPUs.
    8·1 answer
  • The rules on the Internet for how messages are addressed and passed on are called ____ .
    15·1 answer
  • You and a friend have just started a small business. How could you use the Internet to make your business successful?
    15·2 answers
  • Which of these statements about PNG is true?
    11·2 answers
  • How does the quantity of data affect the accuracy of an experiment?
    7·1 answer
  • Which backup requires a small amount of space and is considered to have an involved restoration process?
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!