Answer: 37.5%
explanation: if the rest of the socks are colored, then 3/8 of them are colored. 3/8 is 37.5%
Answer: 0.12
Step-by-step explanation: Well since 5/5=1 and in this case 3/5 of 0.2 or
3/5 x 0.2 = 0.12miles of the bridge is finished. to check do 0.2*2/5 since 2/5+3/5=5/5 or the total 0.2miles. so 0.2*2/5 =0.8 and 0.8+0.12= 0.2
9/10 is greater than 6/10
6/10 <9/10