Answer:
4,250,000 riyals
Step-by-step explanation:
The total cost of drilling a 500-meter well is the sum of fixed costs (1,000,000 riyals) and variable costs.
By integrating the marginal cost function we get the variable costs function. Evaluating the variable costs function from 0 to 500 meters, gives us the total variable cost.

Total cost of drilling is:

25,200 hours
112x12=1,344
212x112=23,744
1,344+23,744+112=25,200
Hello!
<u><em>Answer: =1944 *The answer must be have a positive sign*</em></u>
Explanation:
Multiply by the numbers. Product it's going to be multiply by the numbers, fractions, decimals, factors, and multiples.
243*8=1944
1944/8=243
1944/243=8
Hope this helps!
Thanks!
Have a great day!
-Charlie
Answer:
What exactly do you need help with?
Answer: Blue felt = 20*2.5 = 5074-50=24 yards of red24/20 = 1.2 each student gets 1.2 yards of red felt So the answer is 1.2 Yards.each of his 20 students gets 2.5 yards of blue felt for the project. He also gives each student an equal amount of red felt.
Step-by-step explanation: