Answer:
58 minutes.
Step-by-step explanation:
From the question, Karen worked on the model in two windows;
1) 11.13 AM - 11.54 AM = 41 minutes
2) 1.29 PM - 1.46 PM = 17 minutes.
Hence, the total amount of time Karen spent working on the Shuttle model is:
41minutes + 17minutes = 58 minutes.
Answer:
-6
Step-by-step explanation:
h(x) = -3x – 12 becomes h(-2) = -3(-2) – 12 = -6
<span>The volume of each celluloid die is (.25 x .25 x .25) = 0.015625 cubic inch.
To manufacture 24,000 of them, you need to start with <u>at least</u>
(24,000) x (0.015625) = <u>375 cubic inches</u>.
I don't know how celluloid is sold, so you should also keep in mind that
375 cubic inches = about 207.8 fluid ounces, or about 6.5 quarts.
I'm sure a bit more than that was used in the manufacture, since
there's always some wasted, spilled, or trimmed off of the edges. </span>
3/5 x 10= 6 miles because coach runs 10 times what you run
8 x 7 x 10 x 6 = 3360 ft . I believe this should be the answer.