Answer:
Expected time is 15 hours for him to get to safety.
Step-by-step explanation:
We define X as the time that this miner would get to safety.
We define Y as the door he chooses initially.
P(Y= 1) = P(Y=2)=P(Y=3) = 1/3
We have E[X|Y=1] = 3
E[X|Y] = 5 hours + E[X}
E[X|Y] = 7 hours + E[X]
Then we have
E[X] = 1/3(3 + 5 + E[X] + 7 + E[X])
We cross multiply
3*E[X] = (15 + 2E[x])
3E[X] - 2E[X] = 15
E[X] = 15
So the time it would take to get him to safety is 15 hours
Answer:
=5
Step-by-step explanation:
4-9= -5
2-3 = -1
=5
.....
Answer:
D
Step-by-step explanation:
A is not, because 2-5x = -5x+2
(nothing has changed but the order)
B is not, because 3-5+2x = 2x-2
because 3-5 = -2. so -2+2x can be rewritten as 2x-2.
C is not, because 5x-2x = 3x
because you combine like terms, and 5-2 is 3
D <em>i</em><em>s</em><em>,</em> because 2x-2+3x = 5x-2
because you combine like terms (2x+3x=5x) and -2 is left.
Answer:
12% increase
Step-by-step explanation:
Divide the difference between the two prices by the original price:
1.05/8.95
= 0.12
So, the percent change is 12%
Answer:
Step 1: Set up the synthetic division. ...
Step 2: Bring down the leading coefficient to the bottom row.
Step 3: Multiply c by the value just written on the bottom row. ...
Step 4: Add the column created in step 3.
Step-by-step explanation:
In algebra, polynomial long division is an algorithm for dividing a polynomial by another polynomial of the same or lower degree, a generalised version of the familiar arithmetic technique called long division. ... The result R = 0 occurs if and only if the polynomial A has B as a factor.