Answer:
<h2>32/1125</h2>
Step-by-step explanation:
Probability is the likelihood or chance that an event will occur.
Probability = Expected outcome of event/Total outcome.
If a video rental store keeps a list of their top 15 movie rentals each week, the total outcome is 15.
If the list for the week includes 6 action, 4 comedies, 3 dramas, and 2 mysteries and the store manager removes a copy of each of the 15 movies from the shelf, then randomly selects 3 of the 15 to show on the display monitors in the store, the probability that she selected 2 comedies and 1 action movie will be calculated as shown;
Probability of selecting 2 comedies = 4/15*4/15 = 16/225 (Note that the expected outcome in this case is 4).
Probability of selecting 1 action movie = 6/15 = 2/5
<em>Hence, the probability that she selected 2 comedies and 1 action movie will be equivalent to 16/225*2/5 = 32/1125</em>
<em>Note that the rented movies will have to be returned hence reason for the replacement. </em>
The translations would be this
1) reflection over the x-axis
2) translation of (-6,0)
In trigonometry, we start from the point (1,0), so this is the 0-degree point. Then, we start rotating counter clockwise along the unit circle.
Note that rotating 180 or -180 degrees is actually the same, because you travel half the circumference clockwise or counter clockwise. In both cases, you start from the rightmost point of the circle, (1,0), and arrive at the leftmost point, (-1,0).
Now, for every point (x,y) on the unit circle, given by a certain angle
, we have

So, in this case, the angle of -180 is associated with the point (-1,0), and thus we have

Answer:
828.7 hours.
Step-by-step explanation:
To answer a question in which the total time has to be calculated of all the activities, first of all, all the times have to be converted to a single form. There are two types: decimals and fractions. Convert the fractions into decimals.
Department A = 202.50 hours.
Department B = 212 3⁄4 hours = 212.75 hours.
Department C = 198.25 hours.
Department D = 215 1⁄5 hours = 215.20 hours.
Therefore, the total number of hours spent on this project by all four departments. is the sum of all the above numbers. 202.50 hours + 212.75 hours + 198.25 hours + 215.20 hours = 828.7 hours.
Therefore, the total time is 828.7 hours!!!
Answer:
it should be 10,000 square meters
Step-by-step explanation:
my mind