0.625 or <span>5/8 left of the apple</span>
its easiest if you put it in y = mx + b form, where b is the number you plot on the y axis and m is your slope.
rearranging...
x + 3y = -5 3y = -x - 5 y = -1/3 x - 5/3
so your b value is -5/3, which is where you'll plot a point on the y axis. the slope is -1/3
since slope is rise over run, [and this case its negative] you'll go down 1 and to the right three.
edit: then draw a point there, connect the points, and you'll have a line =]
You would do 3x+90=180 because a straight line equals 180°. then you find x=30. then x and z add to get 180 because x fits in the slot above z so 180-30 equals 150°. if z equals 150° then 180-150 equals 30. so x=30,y=15, and z=150
Let the Distance between A and B be : C km
Given : The Man Travels from A to B at a Speed 4 km/h
⇒ The Man Travels 4 km in One Hour during his Journey from A to B
⇒ 
⇒ 
Given : The Man Travels from B to A at a Speed 6 km/h
⇒ The Man Travels 6 km in One Hour during his Journey from B to A
⇒ 
⇒ 
⇒ 
We know that One Hour contains 60 Minutes
⇒ The Total Time taken by Man = 
Given Total Time Taken by Man is 45 Minutes
⇒ 25C = 45
⇒ 
But the Total Distance Traveled by the Man is 2C
⇒ 2C = 2 × 1.8 = 3.6 km
⇒ The Total Distance Traveled by the Man is 3.6 km
Answer: Total number of bracelet: 235
Step-by-step explanation:
Given:
Total budget= $1,500
Spend on wire = $250
Per braclet beads = $5.30
Find:
Total number of bracelet
Computation:
Total number of bracelet = [1,500 - 250]
Total number of bracelet = [1,250/ 5.30
Total number of bracelet = 235.849
Total number of bracelet = 235 [By round minium]