If the first two terms are 1 and 1, then what is the tenth term?
Answer:
The 10th term will be 55
Explanation:
In the Fibonacci Sequence, we add the previous digits to get the next digit. So, here 1st term is 1.
First term= 1
Second term = 0+1= 1
Third term= 1+1=2
Fourth term= 1+2= 3
Fifth term= 2+3= 5
Sixth term= 3+5= 8
Seventh term= 5+8 = 13
Eighth term= 8+13= 21
Ninth term= 13+21= 34
Tenth term= 21+34 = 55
So, the 10th term is 55.
We will find the volume of each rectangular prism separately.
<h3>Top Figure</h3>
<h3>Bottom Figure</h3>
<h3>Adding Together</h3>
The statement for geometric model using algebra tiles represents the factorization is the statement number 2.
<h3>What is algebra tile?</h3>
Algebra tiles used to represent the algebraic expression in the table form. The shape of algebra tile is square and rectangle, in which the variables represented.
The given polynomial equation in the problem is,
In the above polynomial, the highest power of variable is 2. Thus, it is a quadratic equation.The image of the algebra tile for the given polynomial attached below.
The statement which satisfy the polynomial and its algebra tile is,
An algebra tile configuration.
- 3 tiles are in the Factor 1 spot: 1 is labeled x and 2 are labeled negative.
- 3 tiles are in the Factor 2 spot: 1 is labeled x and 2 are labeled negative.
- 11 tiles are in the Product spot: 1 is labeled x squared, 4 are labeled negative x, and 6 are labeled.
Thus, the statement for geometric model using algebra tiles represents the factorization is the statement number 2.
Learn more about the algebra tile here;
brainly.com/question/4407619
Answer:
There were 90 questions in the test.
Step-by-step explanation:
He missed 88 questions on the test and scored a 2%. This means that the 88 questions missed correspond to 100% - 2% = 98% of the total number of questions, which is x. So
Rounding up
There were 90 questions in the test.
4 days.
If it takes 6 days for 8 people to pick apples then it must take 48 days for 1 person to do it because 6•8=48.
So then it must take 12 people
48/12 days which is 4 to pick apples from trees.