Check picture for working out
The answer would be D. y=75x+300 because if you multiply 75 and 20 you would get 1500 and subtract 1800 for how much was paid and 1500 for the result of multiplying 75 and 20
Answer is D. y=75x+300
Work done on cart
:
W
=
6000
J
Kinetic energy of cart
:
E
K
=
6000
J
Explanation:
Work done
W
is defined as the product of force
F
and distance
s
:
⇒
W
=
F
⋅
s
Let's substitute the values of
F
and
s
into the equation:
⇒
W
=
300
N
⋅
20
m
⇒
W
=
300
kg
⋅
m s
−
2
⋅
20
m
⇒
W
=
300
⋅
20
kg
⋅
m
2
s
−
2
⇒
W
=
6000
kg
⋅
m
2
s
−
2
∴
W
=
6000
J
The gain in kinetic energy
E
K
is the same amount as the work done moving the cart:
∴
E
K
=
6000
Answer:
19.4in
Step-by-step explanation:
1) formula for area of a triangle:
(b*h)/2=a
the area and height are already given so lets substitute them in the formula.
(b*23.8)/2=230.86
1) multiply by 2 on both sides
b*23.8=461.72
divide by 23.8 on both sides
b=19.4
the base is 19.4 in
hope this helps
Answer:

Step-by-step explanation:
The equation of a circle with center (h,k) and radius r is given by the formula;

Given (h,k)=(0,0) and r=4, we substitute the values to obtain;

The required equation is
