Answer:
375 j
Explanation:
Work done = increase in kinetic energy
C is the correct answer for this question. 375 work must be done on a 10 kg bicycle.
1: 1/5*10 * (10+5)(10-5)
Work Done: 375J
<em><u>Hope this helps.</u></em>
Answer:
Speed or velocity is plotted on the Y-axis. A straight horizontal line on a speed-time graph means that speed is constant. It is not changing over time. A straight line does not mean that the object is not moving
Answer:
Frequency, f = 0.2 Hz
Explanation:
We have,
A baseball player throws 4 balls every 20 seconds.
It is required to find the frequency of the baseball.
Frequency of an object is defined as the number of times an event occurs. It is given by number of throws per unit time. It can be given by :
So, the frequency of his throw is 0.2 Hz.
Answer:
See the explanation below
Explanation:
In the attached image we can see the free body diagram and forces acting on the book.
Force F, which acts to the right, the friction force which acts in the opposite direction to the movement, i.e. to the left.
The force exerted by the weight of the book that is equal to the product of the mass of the book by the gravity of the book. The normal force that is equal in magnitude to the weight of the book but in the opposite direction.
3, 1 could be.
And there's always Heisenberg's uncertainty principle !!!