Track A takes 20 minutes
Track B takes 15 minutes
In 1 minute track be will do a fraction of 1/20, while track B will do 1/15
Both tracks in a minute = 1/20+1/15
= 35/300
Therefore the two tracks will take 300/35 minutes to fill the 200 cubic feet
That is 300/35
= 8.57 minutes
≈ 9 minutes
Answer:
Convert 4.5% to a decimal. 6000,0.045, 8 years
Step-by-step explanation:
I used math--way
Answer:
C=2pi
Step-by-step explanation:
Answer:
The cone has a greater height because the bases are the same, but the volume of the cylinder is less than 3 times the volume of the cone.
I don't think I was ever taught the "unit form" of something, but it basically just applies as follows:
111 = 1 Hundred, 1 Ten, 1 One.
725 = 7 Hundreds, 2 Tens, 5 Ones.
etc.
So, $2 in Unit form would either be:
2 Ones.
or
2 Dollars.
Hopefully that helps, have a great rest of your day! ^ ^
{-Ghostgate-}