Answer:
The expected total amount of time the operator will spend on the calls each day is of 210 minutes.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
n-values of normal variable:
Suppose we have n values from a normally distributed variable. The mean of the sum of all the instances is
and the standard deviation is 
Calls to a customer service center last on average 2.8 minutes.
This means that 
75 calls each day.
This means that 
What is the expected total amount of time in minutes the operator will spend on the calls each day
This is M, so:

The expected total amount of time the operator will spend on the calls each day is of 210 minutes.
Answer:
1
Step-by-step explanation:
Answer:
Covered: $3712
Still need to pay: $928
Step-by-step explanation:
4/5 --> 0.8 --> 80%
4640 x 0.8 --> 3712
Covered: $3712 (which is 80%)
Still need to pay: $928 (which is 20%)
Use the formula for the sum of a geometric sequence:
Sum = (a(r^n - 1))/(r - 1)
where a is the first term, -3
r is the common ratio, -2
and n is the number of terms
Thus,
Sum = ((-3)((-2)^10 - 1))/(-2-1) = 1023
Answer:

Step-by-step explanation:
we know that
The formula of slope is "rise over run", where the "rise" (means change in y, up or down) and the "run" (means change in x, left or right)
In this problem
The tangent of angle of 5 degrees is equal to the quotient of "rise over run"
Let
y ----> the rise of the ramp
x ----> the run of the ramp

we have

substitute and solve for x


