1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
iren2701 [21]
3 years ago
11

Find the area. Answer ASAP pls pls

Mathematics
1 answer:
uysha [10]3 years ago
4 0

Answer:

42 1/4

Step-by-step explanation:

multiply 6.5x6.5 and you will get 42.25 which it 42 1/4

You might be interested in
A circular "Do Not Enter" road sign has a diameter of 54 centimeters. Which measurement is closest to the area of the sign in sq
Katen [24]

Answer:

it is 169.56

Step-by-step explanation:

5 0
3 years ago
Plz, help me if u cant answer both could you just answer one of them for me.
labwork [276]

Answer:

for 2. I don't think it can be a triangle

3 0
3 years ago
Read 2 more answers
Solve 2^3x=172 Use logarithmic please
I am Lyosha [343]
2^3x = 172
3x log 2 = log 172
3x = 7.4263
x = 2.475

i am a mathematics teacher. if anything to ask please pm me
4 0
4 years ago
Please help me I would really like to know
Fittoniya [83]
The correct answer is 6x-15
3 0
3 years ago
Read 2 more answers
for pet food: how would adopting a process costing system benefit the managers responsible for the production of this product? l
lapo4ka [179]

Job order costing also gives managers the advantage of being able to keep track of individuals' and teams' performance in terms of cost control, efficiency, and productivity. A disadvantage of job order costing is that employees are required to track all materials and labor used during the job.

With the standardization of products, managers track performance, productivity, and costs over time. Process costing allows for greater flexibility when making changes in the production process. Managers can target specific departments' processes or materials to lower production costs.

With process costing, companies track the flow of costs from department to department, rather than tracking costs for each individual item. Each department adds direct labor and manufacturing overhead costs, plus the cost of any raw materials it uses.

Learn more about the costing system at

brainly.com/question/24516871

#SPJ4

7 0
2 years ago
Other questions:
  • The price P of a large cheese pizza is 7.95Plus .75 for each topping t on the pizza
    7·1 answer
  • Use all 2,4,6,8 Once and any operation and brackets to find two equations that equal 24
    13·1 answer
  • A Dixie cup of water is in the shape of a cylinder with diameter 8 cm and height 15 cm. Emily is using
    8·1 answer
  • Why type of angle pair is formed by angles DCE and BCE
    12·1 answer
  • Add If the answer is an improper fraction , write it as a mixed number <br> 3 1/3+ 2 1/6=
    14·1 answer
  • 98.3×10³ ok but the little 3 is supposed to be a four I just couldn't find a four I stg imma cri
    9·1 answer
  • When you buy 6 compact discs for $39, you get one additional disc free. what is your cost per disc?
    8·1 answer
  • What is the distance between (1,7) and (9,1)
    8·1 answer
  • I need help with 2&amp;3
    15·1 answer
  • Write a linear equation from the points (-4,-13) and (3,1)
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!