Answer:
a. 0.38%
b. 266.75 days
Step-by-step explanation:
We have the following data, mean (m) 269 and standard deviation (sd) 15, therefore:
a. The first thing is to calculate the number z:
z (x) = (x - m) / sd
z (309) = (309-269) / 15 = 2.67
When looking in the normal distribution table (attached), we have that at this value of z, the probability is:
P (z> 2.67), that is to say we must look in the table -2.67 and this value corresponds to 0.0038, that is to say 0.38%
b. Find the z-value with a left tail of 44%, i.e. 0.44. We look in the table for this value and what value of z corresponds.
invNorm (0.44) = -0.15
Find the corresponding number of days:
x = z * sd + m
we replace
d = -0.15 * 15 + 269 = 266.75 days
Answer:
its 50 points but still answer is a
Answer:
Step-by-step explanation:
Remark
When a quadrilateral is inscribed in a circle, the opposite angles are supplementary. x is opposite 112 degrees. Therefore x and 112 add up to 180 degrees.
Formula
x + 112 = 180 Subtract 112 from both sides.
Solution
x + 112-112 = 180 - 112
x = 68
Answer
x = 68
Answer:
You subtract 9 from both sides
Step-by-step explanation:
You have to get the variable by itself to solve so you subract 9 by 9 and they cancel each other out. Then you do -12-9 and since they are both negative you get get -21
Them you have your answer m=-21, you can check this by plugging m inot the equation