Answer: 55.56
Step-by-step explanation:
Let the unknown number be k
(45 x k) / 100 = 25
45k/100 = 25
multiply both sides by 100
45k = 25 x 100
45k = 2500
divide both sides by 45
k = 2500/45
k = 55.56
Answer:
160
Step-by-step explanation:
24/6=4
4 x 40 = 160
x is 160 when y is 24
Based on the given problem above, here is the solution.
Given: Iris's charge: 470
1 1/5 times her fee: additional hourly rate
? = fee for an hourly rate
What we need to do first is divide 470 by 7 hours, so 470/7 = 67.143/hour.
So Iris's per hour is 67.143 without the additional rate.
Now, let's look for the 1 1/5 of 470. 1 1/5 is equal to 1.2. So 470 x 1.2 = 564.
To get the total fee of her hourly rate, we add 67.143 and 564, so Iris's hourly rate then is 631.143 or 631.14.
Answer:
slope of (16,8) (8,4) is 1/2
Finding the regression equation, her average speed on the 9th day should be expected to be of 6.92 minutes per mile.
<h3>How to find the equation of linear regression using a calculator?</h3>
To find the equation, we need to insert the points (x,y) in the calculator.
Researching the problem on the internet, the values of x and y are given as follows:
- Values of x: 1, 2, 3, 4, 5, 6.
- Values of y: 8.2, 8.1, 7.5, 7.8, 7.4, 7.5.
Hence, using a calculator, the equation for the average minutes per mile after t days is given by:
V(t) = -0.15143t + 8.28
Hence, for the 9th day, t = 9, hence the estimate is:
V(9) = -0.15143(9) + 8.28 = 6.92 minutes per mile.
More can be learned about regression equations at brainly.com/question/25987747
#SPJ1