Answer:
8+6=14
Step-by-step explanation:
that is my answer ig
Answer:
elasticity supply of dog food = 2.61
elasticity supply of cat food = 1.71
Step-by-step explanation:
The midpoint formula for elasticity is:
![Elasticity = \frac{(Q2-Q1)/[(Q2+Q1)/2]}{(P2-P1)/[(P2+P1)/2]}](https://tex.z-dn.net/?f=Elasticity%20%3D%20%5Cfrac%7B%28Q2-Q1%29%2F%5B%28Q2%2BQ1%29%2F2%5D%7D%7B%28P2-P1%29%2F%5B%28P2%2BP1%29%2F2%5D%7D)
Point 1: Q = 39.0 and P = 5.50
Point 2: Q = 101.0 and P = 7.75
![Elasticity\ supply\ of\ dog\ food = \frac{(101.0-39.0)/[101.0+39.0)/2]}{(7.75-5.50)/[(7.75+5.50)/2]}=2.61](https://tex.z-dn.net/?f=Elasticity%5C%20supply%5C%20of%5C%20dog%5C%20food%20%3D%20%5Cfrac%7B%28101.0-39.0%29%2F%5B101.0%2B39.0%29%2F2%5D%7D%7B%287.75-5.50%29%2F%5B%287.75%2B5.50%29%2F2%5D%7D%3D2.61)
Doing the same for the cat food:
![Elasticity\ supply\ of\ cat\ food = \frac{(71.0-39.0)/[71.0+39.0)/2]}{(7.75-5.50)/[(7.75+5.50)/2]}=1.71](https://tex.z-dn.net/?f=Elasticity%5C%20supply%5C%20of%5C%20cat%5C%20food%20%3D%20%5Cfrac%7B%2871.0-39.0%29%2F%5B71.0%2B39.0%29%2F2%5D%7D%7B%287.75-5.50%29%2F%5B%287.75%2B5.50%29%2F2%5D%7D%3D1.71)
In the construction of the equilateral triangle EFG inscribed in a circle, Chase can find points F and G as D. Points F and G are points of intersection of two congruent circles centered at D and E.
<h3>What is an equilateral triangle?</h3>
It should be noted that an equilateral triangle simply means a triangle that has all the sides and angles to be equal.
After drawing the diameter of the circle through the center, it's important to open the compass to a width that's equivalent to the radius the circle.
In this case, it can be deduced that Points F and G are points of intersection of two congruent circles centered at D and E.
Learn more about triangles on:
brainly.com/question/17335144
Answer:
The answer is: "Key in hand" or "Turnkey contract".
Step-by-step explanation:
These are the names that receive the type of projects in which the builder assumes the execution of the work as a whole, from the phase of basic engineering, detail, management of purchases and subcontracts, purchase of materials and equipment to the supervision of the Work and setup. The client receives the facility ready to be used, just as when you buy a new car and you receive the key to take it out from the dealership.
Answer:
13.31803792
Step-by-step explanation:
<u>Law of Cosines</u>
a= 8
b= 18
c= ?


c = 64 + 324 - 2 * 8 * 18 * cos(43)
cos(43) = 0.7313537016
<u>Order of Operations</u>
64 + 324 - 2 * 8 * 18 * 0.7313537016 = 177.3701339
<u>Square Root the answer</u>
= 13.31803792