If George completed 3/5 of work in 9 days, it means that he needs 3 days to finish 1/5th of the work.
The remaining part is 2/5 because 1-3/5=2/5. 2/5 is also 6/15
From this, how much did George do? in the first 3 days he did 1/5th and then one more day was left, during which he did 1/5/3=1/15th.
So he did in total 1/15+1/5=1/15+3/15=4/15.
this means that Paul did the rest of 6/15, so Paul did 6/15-4/15=2/15.
So we know that he does 2/15 in 4 days, which means that every two days he can do 1/15 of the work
so he would need 15 times 2 days to finish the work - 30 days!
$25.75 is how much money she saved up each week
point slope equation formula: y - y1 = m (x - x1)
(-1,4) (-2,1)
answer:
1 -4 = 3 (-2+1)
Answer:
C
Step-by-step explanation:
ITS ALWAYS C UWU
Answer:
Step-by-step explanation:
If this is in terms of angles, 4x+6 must be equal to 90 since it is half of the angle produced by a line (180°) So solving for 4x+6=90, x=21