Answer:
Minimum cycle time = time for longest task = 2.4 minutes
Maximum cycle time = sum of the times to complete all the tasks = 18 minutes
Step-by-step explanation:
For the minimum cycle time, the reasoning is that all the tasks can be done simultaneously, at some during the assembling task. Hence, minimum time to complete one cycle is the time it takes to complete task that takes the longest time to complete.
For the maximum cycle time, the reasoning here is that each task is done after the completion of the previous task. The total time taken to finish the task will then be the sum of the time taken to complete each task. This usually is at the beginning of operations.
Step-by-step explanation:

Hey there
<span>240 times 365 can be written as 240 x 356.
</span><span>240 x 356 = </span>87600
Since the first two numbers have the same radical, they can be combined.
-3√7-3√7=-6<span>√7
Simplify -2</span>√32 to get -8<span>√2.
So simplified, you would get -6</span>√7-8<span>√2.</span>