Answer:b.activity-based costing.
Step-by-step explanation: Activity-based costing is a costing system that first talkies or identifies the activities that are involved in the Manufacturing or in a particular process and them assigns cost to such activities. This type of costing gives high premium or focus on the activities as it assigns cost to products based on the activities that led to the production of the products.
THIS TYPE OF COSTING IS ALSO KNOWN AS ABC APPROACH TO COSTING IT FIRST ASSIGN RESOURCES TO ACTIVITIES AND FROM ACTIVITIES TO PRODUCTS BASED ON THE CONSUMPTION ESTIMATES.
Solve either equation for either variable. Since the second one has y on its own, the easiest choice is to solve that for y.
-5x + y = 13 ⇒ y = 5x + 13
Now substitute this into the other equation to eliminate y and rewrite it entirely in terms of x :
-3x + 3y = 3 ⇒ -3x + 3 (5x + 13) = 3
Simplify and solve for x :
-3x + 15x + 39 = 3
12x = -36
x = -3
Substitute this into either original equation to solve for y. Plugging x = -3 into the first equation would give
-3 (-3) + 3y = 3
9 + 3y = 3
3y = -6
y = -2
So the solution to the system of equations is (x, y) = (-3, -2).
D = 90
This is because any line is equal to 180 degrees, we see that d is situated on a line that continues into another angle, the other angle is 90 degrees, so we minus 90 from 180, to get 90.
E = 99
E is situated on a line with the other angle F, F = 81 (see below) so we minus 81 from 180
F = 81
F is situated on a line, we minus it from the other angle situated on the same line, so we minus 99 from 180to get 81
Hope this helps! Please make me the brainliest, it’s not necessary but appreciated, I put a lot of effort and research into my answers. Have a good day, stay safe and stay healthy.
Answer:
x=0.875
Step-by-step explanation:
3x-6=2-5x
Add 6 on both sides (6+2)
2x=8-5x
Add 5x on both sides
7x=8
Divide 7 from both sides
x=0.875
4 would be your answer lol