1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
umka2103 [35]
3 years ago
6

Plzzzzzz helpppppp!!!!!!

Mathematics
1 answer:
stepladder [879]3 years ago
3 0

Answer:

h(x) ≤ 5

Step-by-step explanation:

The function and boundaries given are;

h(x) = x + 2, x < 3

And ;

h(x) = -x + 8, x ≥ 3

Now,in the first condition, the maximum value of x will be 2. This means the maximum value of h(x) there is;

h(2) = 2 + 2 = 4

For the second condition, x ≥ 3. Thus, the maximum value of x is 3.

This means that the maximum value of h(x) here is;

h(3) = -3 + 8 = 5

Foe the 2 conditions combined it is clear that the maximum value of h(x) is 5.

Thus,we can say; h(x) ≤ 5

You might be interested in
4w^3z^4+3w^3+4z^4+2w^3z^4+z please simplify!!
weeeeeb [17]
The simplified expression is 6x^3 z^4 + 4z^4 + 3x^3 + z
7 0
4 years ago
Read 2 more answers
while hiking, kendra went up 20 meters.If kendra started at 8 meters above sea level, which integer represent her elevation now?
AVprozaik [17]

Answer:

+28

Step-by-step explanation:

She started at 8 meters above sea level   +8

She went up 20 meters   +20

+8+20 = +28

She is 28 meters above sea level   +28

7 0
3 years ago
Read 2 more answers
The Dulac Box plant produces 500 cypress packing boxes in two-10 hour shifts. Due to higher demand, Dulac has decided to operate
Keith_Richards [23]

Answer:

Production has increased 20/day

Step-by-step explanation:

In the first scenario production is 500/day and productivity 25 set/hour. After the changes, production is 600/day and 25 set/hour.

So productivity remains the same, nevertheless, as there are more productive hours per day, production raises, in this case the can be calculated as (New Production-Old Production)/Old Production=(600-500)/500=100/500=0.2=20%.

As productivity remains the same, you do not ge more sets/shift, as shifts are shorter (8 instead of hours, so you get 200/shift instead of 250/shift). The rest of the option is false as productivity remains constant

6 0
4 years ago
ifying an Error Examine the work shown. Explain the error and find the correct result. 2(4 – 16) – (–30) 2(–12) – (–30) 24 – (–3
Dvinal [7]

Answer:

The error is in the middle: 2(-12) = -24 not 24.

Step-by-step explanation:

7 0
3 years ago
Read 3 more answers
P and Q are two points on the line x-y+1=0 and are at distance 5 from the origin. Find the coordinates of P and Q.
Rashid [163]

Answer:

P and Q are two points on the line x-y+1=0 and are at the distance 5 units from origin. Find the area of the triangle OPQ. P and Q are two points on the line x-y+1=0 and are at the distance 5 units from origin. ... The area of PQR is 7*7/2 = 49/2 sq units.

4 0
3 years ago
Other questions:
  • Help me asap please
    5·1 answer
  • Find the greatest perfect square that is factor of the number. 650
    11·1 answer
  • What's the question? Compare 643251:633512:and 633893.the answer is 633251.
    15·1 answer
  • What happens to the width of a confidence interval for a population mean if the level of confidence is increased without changin
    13·1 answer
  • Having a bit of trouble solving this problem
    9·1 answer
  • For each problem, find the missing value using the Pythagorean Theorem
    12·1 answer
  • Someone please help with the Determine Rate of Change Question I’m gonna fail please help me
    15·1 answer
  • What type of photography is most likely to be seen on websites and in advertising?
    6·2 answers
  • At East Junior High School, there are a total of 1175 students in the 7th and 8th
    10·1 answer
  • What is the slope of this line? :(
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!