The error bars are used to indicate the variability of the data presented in a graph.
There are several quantities that can be used to generate error bars in the graph. These are:
standard deviation
standard error
confidence interval
Usually, one standard deviation above and below the mean is used although it is advised to indicate which variability data is used to generate the error bars in the graph since the 3 quantity given are not equal.
I belive it would be B. because of the fact that they are parallel which means their slope should stay the same...but their y-intersept would change
Answer:
B
Step-by-step explanation:
233/285*100
0.81754*100
81.754%
Let n = 30
We are actually looking for a_30.
a_30 = 4(30) + 1
a_30 = 120 + 1
a_30 = 121
Answer: The professor was not accurate with his hypothesis.
Null hypothesis: P1 = 12.5%, P2 = 42.5%, P3 = 45%
The alternate hypothesis: At least one proportion of the student will differ from the others.
Step-by-step explanation: To check if the professors hypothesis were inaccurate.
What percentage of student bought a hard copy of the book.
(25 ÷ 200) × 100 = 12.5%
What percentage of the student printed it from the web.
(85 ÷ 200) × 100 = 42.5%
What percentage of the students read it online.
(90 ÷ 200) × 100 = 45%
This means that the professor was not accurate with his hypothesis. Because the proportion of student in his hypothesis was not the same in the actual.
Therefore; the null hypothesis are
P1 = 12.5%, P2 = 42.5%, P3 = 45%
The alternative hypothesis will state that at least one of the proportion will be different from the others.