Answer:
Step-by-step explanation:

Answer:
Use quetexy i use it all the time
Step-by-step explanation:
Answer:
5.0×10⁷
Step-by-step explanation:
(3÷6)×(10⁴÷10^-4)
(0.5)×(10⁸)
5.0×10^-1×10⁸
5.0×10⁷
Answer:
From 3 to 6 seconds, the rocket is falling 11 yards per second.
Step-by-step explanation:
Normal pace of progress is exactly the same thing as the slant. Since this is explanatory, we can't track down the specific pace of progress as we could if this were a straight capacity. Be that as it may, we can utilize a similar thought. At the point when t = 3, h(t) = 33, so the organize point is (3, 33). At the point when t = 6, h(t) = 0, so the facilitate is (6, 0). Attachment those qualities into the incline recipe:
m= 0-33/6-3 and m=-33/3 which is 11
From 3 to 6 seconds, the rocket is falling 11 yards each second.
Brainliest?
<u>Answer:</u>
Cost of sand = £150
Cost of bricks = £157.5
Cost of cement = £134
Total cost = £441.50
<u>Step-by-step explanation:</u>
We are given that:
2 tonnes of sand is for £75.00 per tonne,
20 bags of cement are for £6.70 per bag,
350 bricks at 45p each,
So, 2 tonnes of sand at £75.00 per tonne = 2 * £75.00 = £150.00
20 bags of cement at £6.70 per bag = 20 * £6.70 = £134.00
350 bricks at 45p each = 350 * £0.45 = £157.50
Therefore, the total cost of all the materials = £150 + £134 + £157.5 = £441.50