IF the estimates are 100% accurate, then the maximum volume of concrete is the product of the maximum dimensions, namely
Vmax=18.32*12.22*0.55=123.13 m^3
and the minimum volume of concrete is the product of the minimum dimensions
Vmin=18.28*12.18*0.45=100.19 m^3
the uncertainty is therefore 123.13-100.19=22.94 m^3
On the practical side, to this uncertainty must be added to
- squareness of the formwork
- evenness of the surface of the crushed stones on which the foundation sits on
- excess of concrete delivered by the truck
- volume of air bubbles trapped in the the concrete, ...
Answer:
2/6 = 48/144
7/8 = 168/192
Step-by-step explanation:
Use the least common denominator to write an equivalent fraction for each fraction. 2/6 , 7/8 The least common denominator is 24 .
2/6 can be rewritten as __
We Multiply both numerator and Denominator by 24
48/144
7/8 can be rewritten as __
We Multiply both numerator and Denominator by 24
168/192
412 is a whole number, 638 is the number you want to look at.
your answer is 412 638/1000
or 412 63.8/100
hope this helps
Answer: z=83/c - 7 + t
Step-by-step explanation: