Answer:
The answer is
<h2>

</h2>
Step-by-step explanation:
The distance between two points can be found by using the formula
<h3>

</h3>
where
(x1 , y1) and (x2 , y2) are the points
From the question the points are
E(-3,4) and B(-1,6)
The distance between them is
<h3>

</h3>
We have the final answer as
<h3>

</h3>
Hope this helps you
Cccccccccccccccccccccccccccccccc
The x-y coordinates for the given equation are: (-2,11),(-1,7),(0,3), (1,-1) and (2,-5).
<h3>Linear Function</h3>
A linear function can be represented by a line. The standard form for this equation is: ax+b , for example, y=2x+7. Where:
- a= the slope;
- b=the constant term that represents the y-intercept.
The given equation is 16x + 4y = 12. For solving this question, you should replace the given values of x for finding the values of y.
Thus,
- For x= -2, the value of y will be:
16*(-2)+4y=12
-32+4y=12
4y=12+32
4y=44
y=11
- For x= -1, the value of y will be:
16*(-1)+4y=12
- -16+4y=12
- 4y=12+16
- 4y=28
- y=7
- For x= 0, the value of y will be:
16*(0)+4y=12
- For x= 1, the value of y will be:
16*(1)+4y=12
- 16+4y=12
- 4y=12-16
- 4y=-4
- y= -1
- For x= 2, the value of y will be:
16*(2)+4y=12
- 32+4y=12
- 4y=12-32
- 4y=-20
- y= -5
Read more about the linear equation here:
brainly.com/question/1884491
#SPJ1
Answer:
D
Step-by-step explanation:
A <u>linear inequality</u> is an inequality which involves a linear function. A linear inequality contains one of the symbols of inequality: <, >, ≤, ≥.
Consider all options:
A. The inequality
is not linear linear inequality, because x is in the left part denominator and in the right part numerator.
B. This option shows linear equation, not inequality.
C. This option shows quadratic equation, not linear inequality.
D. This option shows linear inequality 
Answer:
Therefore, Steve will paint house for 20.6 days.
Step-by-step explanation:
We know that Steve determines that it would take them 9 days to paint the house together (if they were both healthy) and that it would take Janet (when healthy) 16 days to paint the house alone.
We conclude that in 1 day Janet painted 1/16 of the house. In nine days, Janet painted 9/16 of house.
So, 7/16 of house paint Steve in nine days.
We have the following proportion:

Therefore, Steve will paint house for 20.6 days.