1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
sdas [7]
3 years ago
8

I WILL GIVE 12 POINTS FOR THE CORRECT ANSWER PLEASE HELP

Mathematics
1 answer:
barxatty [35]3 years ago
4 0
Your answer will be 1/14 because you have to reduce the expression by cancelling the common factors.
You might be interested in
Using only the numbers 4 through 12, fill in the circles so that the numbers on each straight line add up to 21
dangina [55]

Answer:

This was fun if you have anymore of these feel free to message me on here if you need help

3 0
3 years ago
There are four cars entered into a pinewood derby race. in how many different orders can they cross the finish line, assuming th
artcher [175]

This is a problem of fundamental counting principle. In a sequence of events, the total possible number of ways all events can performed is the product of the possible number of ways each individual event can be performed. So here there is one car in each place so there 4 possible cars to get the 1st place, 3 possible car for the 2nd place, 2 possible cars for 3rd place and 1 for the 4th place. The 4x3x2x1 = 24 different order 

4 0
3 years ago
Use the table to answer the question. Note: Round z-scores to the nearest hundredth and then find the required A values using th
hodyreva [135]
I think the answer us A b doesn’t adds up
3 0
3 years ago
Andre is making paper cranes to decorate for a party. He plans to make one large paper crane and several small paper cranes. It
il63 [147K]

Andre can make 6 small paper cranes in 30 minutes.

Step-by-step explanation:

Given data-

Time taken by Andre to build small cranes- 3minutes

Time taken to build large crane- 10 minutes

Total time allotted to him= 30 min

His preferences- Building one large crane and several small cranes.

The Inequality equation is 3​c​ + 10 ≤ 30

Since his preference is to build atleast one large crane which takes 10 minutes, he is left with 30-10 = 20 minutes to build other small cranes.

For one crane he needs, 3 minutes

Hence, he can build 6 cranes in 18 minutes. Following this, he is left with  20-18= 2 minutes. Since he needs at least 3 min to build a small crane, he cannot build a small crane in the remaining 2 min.

he builds 6 small cranes in 30 minutes

<u>Alternatively,</u>

3​c​ + 10 ≤ 30

Subtracting 10 from both sides

3c ≤ 20

The maximum value of c for which this equation remains valid is 6.

Thus, he builds a total of 6 cranes (small) in 30 minutes.

5 0
3 years ago
Which graph represents the solution set of the equation 3y - x - 9 = 0?​
xeze [42]

Slope=  

2.000

0.667

​  

=0.333

x−intercept=  

−1

9

​  

=−9.00000

y−intercept=  

3

9

​  

=3

4 0
3 years ago
Other questions:
  • In triangle ABC, angle B = 30°, a = 210, and b = 164. The measure of angle A to the nearest degree is a0
    15·2 answers
  • Please help me asap.. thanks​
    13·2 answers
  • John won 72 pieces of gum
    5·2 answers
  • A bike messenger earns $60 per day plus $12 per delivery. Today the messenger wants to earn at least $204.
    12·1 answer
  • Fission reactions release ______ fusion reactions.
    6·2 answers
  • I REALLY NEED HELP MUCH APPRECIATED
    6·1 answer
  • Someone pls help me fast​
    14·2 answers
  • Help pls .......................................
    5·1 answer
  • A positive integer is 4 less than another. If 3 times the reciprocal of the smaller integer is subtracted from the reciprocal of
    14·1 answer
  • Choose the correct definition of volume.
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!