I think it’s gonna be 6 adults for every 42 students not really sure so sorry if I got it wrong
Considering that the p-value associated for a r<em>ight-tailed test with z = 2.115</em> is of 0.0172, it is found that it is significant at the 5% level, but not at the 1% level.
<h3>When a measure is significant?</h3>
- If p-value > significance level, the measure is not significant.
- If p-value < significance level, the measure is significant.
Using a z-distribution calculator, it is found that the p-value associated for a r<em>ight-tailed test with z = 2.115</em> is of 0.0172, hence, this is significant at the 5% level, but not at the 1% level.
More can be learned about p-values at brainly.com/question/16313918
Answer:
(B) x + 4y = 7
Step-by-step explanation:
Total cost=$142
cost of parts=$62
cost paid for labour=$142-$62=$80
According to question,
》cost of labour per hr=$32
which can be written as,
》cost of labour/time=$32
Use cross multiplication,
》time=cost of labour/32
Since cost of labour is 80,
Time=80/32
=2.5hrs
We can model the equation:y = m x + b, where y is the total profit and x is the number of hotdogs sold.The system of equations is:
90 = 40 m + b210 = 80 m + b---------------------b = 90 - 40 m210 = 80 m + 90 - 40 m210 - 90 = 40 m120 = 40 mm = 120 : 40m = 3b = 90 - 40*3b = 90 - 120b = - 30Answer: The equation is y = 3 x - 30