Answer:
4 min
Step-by-step explanation:
if you look at the plot the dot is a 4
Remark
The equation is job1/ time + job2/time = job3/time
Discussion
job one is the time it takes one of the workers to complete the job.
job two is the time it takes the other workers to complete the job
job three is the time it takes to do the job together.
Givens.
Let Marcus's time = m
Let Tony's time be =t
Let their together time = t1
Equation Substitution and solution.
1/m + 1/t = 1/t1
1/6 + 1/4 = 1/t1 The common denominator on the left is 12.
2/12 + 3/12 = 1 / t1
5/12 = 1/t1 Cross multiply.
5*t1 = 12 Divide by 5
t1 = 12/5
t1 = 2 2/5
t1 = 2.4 hours
Cost
1 hour = 43 dollars for labor.
2.4 hours = x dollars for labor.
1*x = 43 * 2.4
x = 103.2 dollars. <<<<< Answer
Broken down into steps:
1. Find the slope of the line segment that connecs the points (0,-7) and (4,-15).
2. Start with the point-slope formula for the equation of a straight line:
y-b = m(x-a), where the given point is (a,b). Borrow the value of m that you calculated in (1), above, and insert it into this point-slope formula.
Finish up by subst. the x- and y-values in (-3,6) into this formula.
Done!
You could, of course, solve this result for y if you wished.
Answer:
40
Step-by-step explanation:
Ok, so basically let's start with a proportion.
x/32 = 11.25/9
Cross multiply:
x * 9 = 32 * 11.25
9x = 32 * 11.25
9x = 360
Solving for variable 'x'.
Divide each side by '9'.
x = 40
I don't know if this is the correct answer, but it was based on my math. I hope this helps!
Answer:
-1
—— = -0.25000
4
Step-by-step explanation: