Answer:
d: 4 r:5
Step-by-step explanation:
for domain the x coordinates doesn't go over -2 on the left or 2 on the right so if u add the units of the space in between it's 4 since 2- (-2)=4
for the range, the y coordinates never goes over 3 or -2 so range is 5 is u add the units in between
I hope that makes sense!
Answer:
20
Step-by-step explanation:
To calculate the sum of the residuals, subtract the predicted sales from the actual sales in the table below.
Actual sales 55 150 325 510 780 990
Predicted sales 40 150 300 500 800 1,000
This will show the change between them. Add each residual to find the sum.
55 - 40 = 15
150 - 150 = 0
325 - 300 = 25
510 - 500 = 10
780 - 800 = -20
990 - 1000 = -10
These add up to be 15 + 25+ 10 +-20 +-10 = 20
Step-by-step explanation:
I guess, it means every meter costs these amounts.
and the specified costs are not fit the whole bundle.
it is also unclear, if "half of it" means half of the original x meters, or half of the remaining meters (after selling 2/5 of the original meters). I assume the first.
so, we have
-5x
+ 2/5x × 5.5
+ 1/2x × 6.4
+ (10/10 - 4/10 - 5/10)x × 6 = + 1/10x × 6
= 120 ( a income minus costs is the profit, so balancing both sides in a "+" and "-" expression gives us the remaining profit).
about the line with the 1/10 :
the leftovers. 10/10 is the whole x at the beginning.
2/5 = 4/10.
1/2 = 5/10.
I brought all involved fractions to the same denominator of the smallest common multiple of 2 and 5 (10).
in full
-5x + (2/5)x×5.5 + (1/2)x×6.4 + (1/10)x×6 = 120
-5x + 2.2x + 3.2x + 0.6x = 120
-5x + 6x = 120
x = 120
so, he bought 120m in the first place.
4004 + 50.50t = 300.75t
4004 = 300.75t - 50.50t
4004 = 250.25t
4004 / 250.25 = t
16 = t <=== they charge the same at 16 tons
300.75(16) = 4812 <== they cost the same