Answer:
The profit function is:

The maximum value is 406, 300 occurring when x = 640.
Step-by-step explanation:
The revenue function is:

And the cost function is:

Then the total profit function will be:

This is a quadratic function.
Therefore, the maximum value of the total profit will occur at its vertex point.
The vertex of a quadratic is given by:

In this case, a = -1, b = 1280, and c = -3300.
Then the point at which the maximum profit occurs is at:

And the maximum profit will be:

Answer:
x = 9
Step-by-step explanation:
since the terms are in AP then there is a common difference between consecutive terms, that is
a₂ - a₁ = a₃ - a₂ ( substitute values )
x - 7 = 11 - x ( add x to both sides )
2x - 7 = 11 ( add 7 to both sides )
2x = 18 ( divide both sides by 2 )
x = 9
Answer: Y= 3/2x-8=
Step-by-step explanation:Y=4 M= 3/2. X=-8
Y=mx+b
4 = 3/2(8)+b
4= 24/2+b
4= 12+b
-12=-12
-8=b
Answer:

Step-by-step explanation:
A circumference of a circle can be determined by this: 2*pi*r
We're given the diameter. Divide that by 2 to get the radius.
6.45/2 = 3.225
Now multiply that by 2*pi. That gives us 2 * 3.14 * 3.225 = 20.253.
This could've also been done easier by doing pi*d where d is the diameter and you give the answer by multiplying them both. Also works, but the above formula is just key to many things and can also be used to derive the simpler one. Hope it helps! :)
Answer:
B and D
Step-by-step explanation: