Answer:
5 2/5
Step-by-step explanation:
(2 1/4) / x = (1 1/2) / (3 3/5)
so
x = (2 1/4) * (3 3/5) / (1 1/2)
Answer:

General Formulas and Concepts:
<u>Pre-Algebra</u>
Order of Operations: BPEMDAS
- Brackets
- Parenthesis
- Exponents
- Multiplication
- Division
- Addition
- Subtraction
<u>Algebra I</u>
Coordinate Planes
- Reading a coordinate plane
- Coordinates (x, y)
Slope Formula:
Step-by-step explanation:
<u>Step 1: Define</u>
<em>Identify points</em>
Point (0, 2)
Point (3, -3)
<u>Step 2: Find slope </u><em><u>m</u></em>
Simply plug in the 2 coordinates into the slope formula to find slope <em>m</em>
- Substitute in points [Slope Formula]:

- Simplify:

Answer:
5 5/11 hours
Step-by-step explanation:
So, there is a trick to doing this.
You would first need to get their work rate into the same measurements.
That's why we will find out how much they each work in one hour.
Tommy does 1/12 of the work in one hour while Robert does 1/10.
Here we can add them both up to make 11/60.
They finish 11/60 of the work in one hour.
They finish the job in 5 5/11 hours.
Answer:
92°
Step-by-step explanation:
By exterior angle theorem:

We can use ratios and the cross-multiply-divide to find this.
The ratio 21:5 is avaliable via the question. We then need to compare that to the ratio x:100, the 100 being the percent and the x being the number of airplane parts.
21/5 = x/100
We can then solve for x to find the number of airplane parts. First we multiply by 100 on both sides to get 2100/5 = x. Therefore x = 420 and there are 420 airplane parts.