1. The fastest way to produce the tables is to have the person in-charge of finishing and packaging help with the preparation. Then, the person in-charge of preparation and packaging can help with the assembly. The finishing can also be done by three people. Finally, the packaging step can be helped by assembly and finishing people. This would produce more tables per day.
2. No. It would be better if the backup person can help with the task.
3. Tom could do the packaging since he'd be free after doing his step.
4. The scheme in No. 1 can be used.
Answer:
200 ft
Step-by-step explanation:
change 2/3 minute to seconds
units must be the same!!!!
1 minute = 60 seconds
2/3 minute * 60 second/minute = 40 seconds
distance = rate * time
distance = 5 ft/sec * 40 second
distance = 5*40 ft= 200 ft
Answer: C
Step-by-step explanation:
i took the quiz
Answer:
x-axis: (18,0)
y-axis: (0,12)
quadrant 1: (4.5, 10.6)
quadrant 2: (-15, 21)
quadrant 3: (–3/4, –4 1/9)
quadrant 4: (3, –7)