First, let x be the number of hours it will take for Hector to finish the same job alone. This means that every hour, Hector can do 1/x of the job. The amount of work done by Shawn and Hector in 6 hours should be equal to 1 complete work. This can be expressed as,
(1/9 + 1/x)(6) = 1
The value of x is 18. Thus, Hector can to 1/18 of the job in one hour.
Answer:
79.3833333333333333333333333333333333333333333333333333333333333333333333333333333333
Step-by-step explanation:
Answer:
b. g(x)=|x+3|-1
Step-by-step explanation:
8x-2y=24
-8x -8x
-2y=-8x+24
----- ---- ----
-2 -2 -2
y=4x-12
slope: 4
y-intercept: -12
43.94 / 5.2 = 845 is impossible because it would mean that 845 * 5.2 is equal to 43.94 which would be a non sense.
Even if you multiply 84.5 * 5.2 you will still get a bigger result than 43.94 obviously.
The only way this division would make sense, it is if the result is 8.45 so the decimal point should be before the 4 and not after it so June is not correct.
GOod luck :)