15

Problem 1. Network-Flow Programming (25pt) A given merchandise must be transported at a minimum total cost between two origins (

supply) and two destinations (demand). Destination 1 and 2 demand 500 and 700 units of merchandise, respectively. At the origins, the available amounts of merchandise are 600 and 800 units. USPS charges $5 per unit from origin 1 to demand 1, and $7 per unit from origin 1 to demand 2. From origin 2 to demand 1 and 2, USPS charges the same unit cost, $10 per unit, however, after 200 units, the unit cost of transportation increases by 50% (only from origin 2 to demand 1 and 2).
a) Formulate this as a network-flow problem in terms of objective function and constraint(s) and solve using Excel Solver.
b) How many units of merchandise should be shipped on each route and what is total cost?
Engineering
1 answer:
hjlf3 years ago
4 0

Solution :

Cost

Destination           Destination         Destination                     Maximum supply

Origin 1                       5                          7                                           600

Origin 2                     10                         10                                          800

                         15, for > 200            15, for > 200

         Demand          500                       700

Variables

Destination       1          2

Origin 1             $X_1$        $$X_2

Origin 2            $X_3$        $$X_4

Constraints   :   $X_1$, $$X_2, $X_3$, $$X_4  ≥ 0

Supply : $X_1$ + $$X_2  ≤ 600

              $X_3$ + $$X_4 ≤ 800

Demand : $X_1$ + $$X_3  ≥ 500

              $X_2$ + $$X_4 ≥ 700

Objective function :

Min z = $5X_1+7X_2+10X_3+10X_4, \ (if \ X_3, X_4 \leq 200)$

$=5X_1+7X_2+(10\times 200)+(X_3-200)15+(10 \times 200)+(X_4-200 )\times 15 ,  \ \ (\text{else})$

Costs :

                  Destination 1       Destination  2

Origin 1         5                             7

Origin 2        10                           10

                     15                            15

Variables :

$X_1$        $$X_2

300    300  

200   400

$X_3$      $$X_4

Objective function : Min z = 10600

Constraints:

Supply    600 ≤ 600

                600 ≤ 800

Demand   500 ≥ 500

                 700 ≥ 500

Therefore, the total cost is 10,600.

You might be interested in
How does accenture generate value for clients through agile and devops?
Stells [14]
By permanently locking in stakeholder requirements during a project's planning phase
4 0
3 years ago
Select the correct answer.
Rina8888 [55]

A: Inexhaustible resources are limited

is true

6 0
3 years ago
Pre Test
OverLord2011 [107]

Answer:

a is greater torgue

please make brainlist

8 0
3 years ago
Construct a Mohr circle for the stress element at A in problem 2. Using ruler and compass, draw the Mohr circle to the scale. Dr
serious [3.7K]

Answer:

hello your question is incomplete attached below is the missing diagram to the question and the detailed solution

Answer : principal stresses : 0.82 MPa, -33.492 MPa

              shear stress = 17.157 MPa

              ∅ = 9.09 ≈ 10°

Explanation:

The principal stress ( б1 ) = 0.82 MPa

                                 ( б2 ) = -33.492 MPa

The shear stress = 17.157 MPa

∅ = 9.09 ≈ 10°

attached below is the detailed solution and the Mohr's circle

7 0
3 years ago
Briggs & Stratton engines feature both a pressure lubrication and a pressure filtration system. Which statement is true?
Andreyy89
Answer would be Letter B
7 0
3 years ago
Other questions:
  • Octave Chanute’s expertise in designing bridges gave him the know-how to tackle some big questions in aviation, such as the stru
    10·1 answer
  • A hypodermic syringe is used to apply a vaccine. If the plunger is moved forward at the steady rate of 20 mm/s and if vaccine le
    14·1 answer
  • An inductor is connected to a voltage source and it is found that it has a time constant, t. When a 10-ohm resistor is placed in
    12·1 answer
  • Which of the following are the main psychological domains?
    7·1 answer
  • Which one of the following women won the American Mathematical Society Scatter Prize, a Clay Mathematics Institute Fellowship, a
    8·1 answer
  • 9. A vehicle is having routine maintenance performed.
    7·1 answer
  • Why is sssniperwolf so fine
    9·2 answers
  • 1 A power transmission includes a belt drive, a chain drive and a gear drive. Which of the following is the best arrangement bet
    5·1 answer
  • Help with this pls!!!
    12·1 answer
  • What car is this? I thinks its a nissan 240sx but i dont know
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!