Answer:
Minimum cycle time = time for longest task = 2.4 minutes
Maximum cycle time = sum of the times to complete all the tasks = 18 minutes
Step-by-step explanation:
For the minimum cycle time, the reasoning is that all the tasks can be done simultaneously, at some during the assembling task. Hence, minimum time to complete one cycle is the time it takes to complete task that takes the longest time to complete.
For the maximum cycle time, the reasoning here is that each task is done after the completion of the previous task. The total time taken to finish the task will then be the sum of the time taken to complete each task. This usually is at the beginning of operations.
Answer:
Yes it would
Step-by-step explanation:
Lanie's room is in the shape of a parallelogram.
Lanie has a rectangular rug that is 6 feet wide and 10 feet long.
Area of a rectangle = Length × Width
Area of the rectangular rug = 10 feet × 6 feet
= 60 square feet
We are told that:
The floor of her room is shown below and has an area of 108 square feet.
Hence, the rug would fit on the floor of her room because it's area is within the area of the floor of her room.
Answer:
Golf ball
Step-by-step explanation:
The formula for the surface area of a sphere is 4
r². The variable is the radius. Therefore, the sphere with the smallest radius would have the smallest surface area.
So this is asking the cube root of -27 then squared.
Cube root of -27=-3
And -3^2=9
So I believe your answer is 9