1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
weqwewe [10]
2 years ago
6

Find the value of x. Please help will mark brainliest

Mathematics
1 answer:
zloy xaker [14]2 years ago
3 0

Answer:

x=8

Step-by-step explanation:

both sides are even and parallel.

You might be interested in
What is the answer to Q=1/2p+15, for p​
Mazyrski [523]

Answer: Q=1/2p+15,= p=2q-30= Slope = 1.000/2.000 = 0.500

 p-intercept = -30/1 = -30.00000

 q-intercept = 30/2 = 15

Step-by-step explanation: Rearrange the equation by subtracting what is to the right of the equal sign from both sides of the equation :

                    p-(2*q-30)=0  

Solve   p-2q+30  = 0

we have an equation of a straight line. Such an equation is usually written y=mx+b ("y=mx+c" in the UK).

"y=mx+b" is the formula of a straight line drawn on Cartesian coordinate system in which "y" is the vertical axis and "x" the horizontal axis.

In this formula :

y tells us how far up the line goes

x tells us how far along

m is the Slope or Gradient i.e. how steep the line is

b is the Y-intercept i.e. where the line crosses the Y axis

The X and Y intercepts and the Slope are called the line properties. We shall now graph the line  p-2q+30  = 0 and calculate its properties

Notice that when p = 0 the value of q is 15/1 so this line "cuts" the q axis at q=15.00000

 q-intercept = 30/2  =  15

When q = 0 the value of p is -30/1 Our line therefore "cuts" the p axis at p=-30.00000

 p-intercept = -30/1  = -30.00000

Slope is defined as the change in q divided by the change in p. We note that for p=0, the value of q is 15.000 and for p=2.000, the value of q is 16.000. So, for a change of 2.000 in p (The change in p is sometimes referred to as "RUN") we get a change of 16.000 - 15.000 = 1.000 in q. (The change in q is sometimes referred to as "RISE" and the Slope is m = RISE / RUN)

   Slope     =  1.000/2.000 =  0.500

7 0
3 years ago
Identify the conditionals and truth values implied by the following biconditional. Select all that apply.
mina [271]

Answer:

A

Step-by-step explanation:

3 0
3 years ago
How does the position of the decimal point in a quotient as you divide by increasing powers of 10
Digiron [165]
The value decimal point is changing going to the right as you divide a number by 10. For example => 2000.3 / 10 notice the decimal point => 200.013, the value of decimal numbers increases as the value of whole number decreases.Let’s divide again => 200.013 / 10 => 20.0013 , now we already have 4 digits in our decimals. So, simply as we divide the given number by 10, the decimal point moves to the left making the value of whole number decreases and making the number of digits of decimal increase.
4 0
3 years ago
If point A is located at (-7, -3),
Taya2010 [7]

Answer:

-15

Step-by-step explanation:

because you have to add 12 to -3

4 0
3 years ago
Tript Corporation has a process costing system and uses the weighted-average method. The company had 3,000 units in work in proc
ycow [4]

Answer:

<u>11,000 units were started into production which were 100 % complete for materials and 89.1 % complete for Conversion Costs.</u>

Step-by-step explanation:

With the help of Equivalent Units of Production we find out how many units were started.

11,000 units were started into production.

Tript Corporation              

                          Physical Units      % of Completion                Equivalent Units

                                              w.r.t Conversion Costs     Mat       Conversion C  

Units Started              11,000             89.1%                       11,000           9,800

<u>Beginning WIP             3000               60%                       3000              1800</u>

<u>Total units accounted For                                            14,000                 11600</u>

<em><u>We compare the Equivalent units and then find the required balance amounts</u></em>

                      Physical Units      % of Completion                Equivalent Units

                                             w.r.t Conversion Costs       Mat       Conversion C  

Units Completed     10,000             100                            10,000           10,000

<u>WIP Ending               4000               40%                          4000              1600</u>

<u>Total units accounted For                                               14,000               11,600 </u>

4 0
3 years ago
Other questions:
  • What is 6 13/20 as a decimal
    7·1 answer
  • For each of the following functions, identify any restrictions on its domain.
    6·2 answers
  • What is the value of X? Enter answer as a decimal...
    8·1 answer
  • As a part of a class project, meant collected $126 in donations for a local hospice. That amount was 7% of the total amount coll
    9·1 answer
  • Please answer correctly !!!!!!!!!!!! Will mark Brianliest !!!!!!!!!!!!!!!!
    15·1 answer
  • Plane A has just 1 ton of fuel left and has requested plane B to refuel it. Plane B has 21 tons of fuel. Fuel transfer happens a
    11·2 answers
  • Pls help lol uh<br><br> thanks if you do im very confused
    7·2 answers
  • The equation represents the area, A, of a rectangle, in square units.
    11·1 answer
  • Please I really need this answer fast
    14·1 answer
  • Find the magnitude and direction of each resultant for the given vectors. Round each side to the nearest tenth and round each an
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!