1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
iragen [17]
3 years ago
9

A bag contains 2 white marbles and 7 purple marbles. Two marbles are drawn at random. One marble is drawn and not replaced. Then

a second marble is drawn. What is the probability of selecting a purple marble and then a white marble?
Mathematics
1 answer:
andrew11 [14]3 years ago
7 0
Total marbles = 2 + 7 = 9

P(Purple, then white) = (7/9)(2/8) = 7/36

Answer: 7/36
You might be interested in
An icicle is in the shape of an inverted cone with a diameter of 11 mm and a height of 90 mm. How much frozen water is in the ic
postnew [5]

C - 2,849.6

Just took the test and got it right

8 0
3 years ago
A. How many squares with side lengths of 1/4 inch can fit in a square with side lengths of 1 inch?​
yKpoI14uk [10]

Answer:

c

Step-by-step explanation:

in did the work

6 0
3 years ago
Vertex of an absolute value graph ______ of the graph.
Inga [223]

Answer:

is the axis of symmetry

Step-by-step explanation:

i believe this is the answer :)

5 0
3 years ago
Brianne solved a quadratic equation. Her work is shown below, with Step 2 missing.
Alja [10]

Given:

The given quadratic equation is

3(x+4)^{2} = 48

or, (x+4)^{2} =16

And

The roots are given: x = -8 , x = 0

To find the missing step.

Let us solve the equation.

3(x+4)^{2} = 48

or, (x+4)^{2} = 16

or, x^{2} +8x+16 = 16 [ eliminating 16 from both the side]

or, x^{2} +8x = 0

or, x(x+8) = 0

or, x = 0, x = -8

Hence,

The step 2 could be x^{2} +8x = 0

6 0
4 years ago
Read 2 more answers
A 18 -person road crew is scheduled to finish repairing a highway in 10 days. On the morning of the fifth day, several workers o
Pavlova-9 [17]

Answer:

<u>9 workers finished the repairs, therefore 9 members of the original crew were removed. </u>

Step-by-step explanation:

1. Let's review the information given to us to answer the question correctly:

Original crew scheduled to finish repairing a highway = 18 person

Number of days remaining to finish the work = 10 - 4 = 6 days

Number of days that the rest of the crew finished the repairs = 12 days

2. How many workers were removed from the crew?

We will use Inverse Rule of Three to answer this question because the less workers the crew has the more time it will take them to finish the repairs, as follows:

Workers                Days

     18                        6

      x                        12

12x = 18 * 6 (Inverse Rule)

12x = 108

x = 108/12

x = 9

<u>9 workers finished the repairs, therefore 9 members of the original crew were removed. </u>      

3 0
3 years ago
Other questions:
  • What are the zeros of the quadratic function?<br><br> f(x)=4x2−100
    6·1 answer
  • 14) Rounded to the nearest whole number, the square
    14·1 answer
  • A package of 3 pairs of insulated gloves costs $23.97. What is the unit price of the pairs of gloves? ​
    11·2 answers
  • The school store sold five pencils for eleven dollars. determine the cost per pencil
    6·2 answers
  • Help pls all questions are in the photo<br>will give brainliest​
    6·1 answer
  • Write algorithm to calculate sum and difference of any two numbers​
    13·2 answers
  • Helppppp ill give 10 points
    11·1 answer
  • Geometry. Please help. Urgent.
    6·1 answer
  • Median of 1, 2, 3, 3, 4, 5, 6, 6, 6, 7
    15·2 answers
  • Use the vertical line test to determine whether or not the graph is a graph in which y is a function of x.​
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!