Answer:
- 4/3
Step-by-step explanation:
15*$7.70= $115.50
18*$7.70=$138.60
$115.50+$138.60= $254.10
His pay for the two-week is $254.10
Answer: y = 6 mi. .
______________________________________________
Explanation:
______________________________________________
Area of a triangle = (½) * (base) * (height) ;
or, A = (½) * b * h ; or, A = b*h / 2 ;
_____________________________________
Given: A = 24.3 mi ² ;
b = 8.1 mi
___________________
Find the height, "h" ; (in units of "miles", or , "mi" ).
__________________________
Plug in the known values into the formula:
24.3 mi ² = (½) * (8.1 mi) *(h) ;
_____________________________
Solve for "h" (height) ;
_____________________________
(½) * (8.1 mi) = 4.05 mi ;
______________________________
Rewrite:
____________________________
24.3 mi² = (4.05 mi) *(h) ; Solve for "h" ;
_________________________________________
Divide each side of the equation by "(4.05 mi)" ; to isolate "h" on one side of the equation ; and to solve for "h" ;
__________________________________________
24.3 mi² / 4.05 mi = (4.05 mi) *(h) / 4.05 mi ;
→ 6 mi = h ; ↔ h = 6 mi.
→ h = y = 6 mi.
____________________________________________
Answer:
Please see attached image for the graph
Step-by-step explanation:
To graph the elevation versus time, we start by plotting the first point at time zero (when the climb begins) when Zane is 20 meters below the edge (-20 meters). This corresponds to the point (0, -20).
One second later (1 in the horizontal axis), Zane has moved up 4 meters, now reaching -16 meters. This is the point (1, -16) on the graph.
One second later at time 2 seconds, he is another 4 meters up which corresponds to the point (2, -12) on the graph.
you can go on like this plotting more points on the graph.
Please see the attached image that illustrates this and shows the appropriate line that represents Zane's position versus time (pictured in red)