1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
kondaur [170]
3 years ago
11

What is the greatest 2 decimal place number using 4, 0, 7 , 1

Mathematics
2 answers:
LuckyWell [14K]3 years ago
7 0

Answer: 74.10

Step-by-step explanation:

There are in total 4 numbers, so if we want 2 decimal number, then there will be 2 integer part and 2 decimal part.

The largest possible tens place will be: 70 (7)

The largest possible ones place will be :4 (4)

The largest possible tenths place will be: 0.1 (1)

The largest possible hundredths place will be: 0.00 (0)

Hope this helps!! :)

Please let me know if you have any questions

alexgriva [62]3 years ago
4 0
The anwser is 74.10 thank you
You might be interested in
Given PQRS, what is the measure of Q
miskamm [114]

Answer: B.) or C.)

Step-by-step explana

6 0
3 years ago
Read 2 more answers
M5_A3. The expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7.
snow_tiger [21]

Answer:

a) 0.3520

b) 0.9884

c) 0.1292

d) 0.1292

e) 0.7648

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have that:

The expected project completion time for the construction of a pressure vessel is 18 months. So \mu = 18.

And the project variance is 7. The standard deviation is the square root of the variance, so \sigma = \sqrt{7}.

a) What is the probability that the project will require at least 19 months?

The pvalue of the zscore of X = 19 is the probability that the project will require less than 19 months. So the probability that the project will require at least 19 months is the subtraction of 1 by this pvalue.

Z = \frac{X - \mu}{\sigma}

Z = \frac{19 - 18}{\sqrt{7}}

Z = 0.38

The pvalue of Z = 0.38 is 0.6480.

So the probability that the project will require at least 19 months is 1 - 0.6480 = 0.3520.

b) What is the probability that the project will be completed within 24 months?

This is the pvalue of the zscore of X = 24.

Z = \frac{X - \mu}{\sigma}

Z = \frac{24 - 18}{\sqrt{7}}

Z = 2.27

The pvalue of Z = 2.27 is .9884. This means that the probability that the project will be completed within 24 months is .9884.

c) What is the probability that the project will require at least 21 months?

Same logic as a). We find the pvalue of the zscore of X = 21, then we subtract 1 by this value.

Z = \frac{X - \mu}{\sigma}

Z = \frac{21 - 18}{\sqrt{7}}

Z = 1.13

The pvalue of Z = 1.13 is 0.8708.

So the probability that the project will require at least 21 months is 1 - 0.8708 = 0.1292.

d) What is the probability that the project will be completed within 15 months?

Same logic as b). This is the pvalue of the zscore of X = 15.

Z = \frac{X - \mu}{\sigma}

Z = \frac{15 - 18}{\sqrt{7}}

Z = -1.13

The pvalue of Z = -1.13 is .1292. This means that the probability that the project will be completed within 15 months is .1292.

e) What is the probability that the project will take between 16 and 24 months to complete?

This is the pvalue of Z = 24 subtract by the pvalue of Z = 16.

In b), we found that the pvalue of Z = 24 is .9884

Now we find the pvalue of Z = 16

Z = \frac{X - \mu}{\sigma}

Z = \frac{16 - 18}{\sqrt{7}}

Z = -0.76

The pvalue of Z = -0.76 is 0.2236

So the probability that the project will take between 16 and 24 months to complete is 0.9884 - 0.2236 = 0.7648

8 0
4 years ago
Without solving, determine the number of<br> solutions to 3x2 + 5x + 2 = -8. Show your work.
daser333 [38]

Answer:

2 solutions for this equation because the highest power is 2

4 0
3 years ago
Read 2 more answers
Complete the table.<br><br> Original Price Percent of Discount Sale Price<br> $<br> 5% $57
mario62 [17]

Answer:

I think it is $54.15 sorry if wrong

6 0
3 years ago
If a ball is given an acceleration of 3.0 meters/second2 while being pushed with a force of 0.75 newtons, what is the mass of th
Over [174]

The applicable relation between force, mass, and acceleration is ...

... F = <em>m</em>a

Fill in the given values and solve for the mass.

... 0.75 N = <em>m</em>·3 m/s²

... (0.75 kg·m/s)/(3 m/s²) = <em>m</em> = 0.25 kg

The mass of the ball is 0.25 kg.

8 0
3 years ago
Read 2 more answers
Other questions:
  • HELP PLEASE THANK YOU! :) 50 POINTS !!!!!!!1
    7·1 answer
  • 2. Simplify the radical expression
    10·2 answers
  • What is the slope of the line that passes through the pair of points?<br> (1, 7), (10, 1)
    9·1 answer
  • A bus company took a tour bus on the ferry when there were 30 people aboard. The ferry charged the bus company $180.The followin
    8·1 answer
  • How do I do this? the coordinates don’t fit on the graph!
    11·1 answer
  • Which graph represents y = -2x
    5·1 answer
  • Name 3 points that lie on the graph of y = –2x + 7
    11·2 answers
  • PLEASE HELP WITH MY MOST RECENT QUESTION
    11·1 answer
  • What is the mean of the following data set 5,9,5,2,,10
    10·2 answers
  • Please Help ASAP!!!!<br>Will mark branliest if correct.<br>​
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!