We have to see how many times 130 fits into 1494.23:

So now we have to multiply this by the amount of time needed for 130 meters:
11.4940*1=11.4940.
So the answer is 11.4940 minutes.
If a line's slope is

, the slope of the perpendicular line is

in this case, the given line has a slope 4, which is 4/1, so the perpendicular line has a slope/gradient
Answer:
600 because it is in the hundreds place
Step-by-step explanation:
((6)^3 (g^5)^3 (h)^3 + (-4)^3)
(216 x g^15 x h^3 - 64
216g^15h^3 - 64