Answer:
Basically, you have to think: more bricks : more time
more workers : less time
2,400 bricks 6 workers takes 18 hours
You now have to solve for 4,500 blocks and 10 workers
4,500 / 2,400 = 1.875 (times greater)
10 / 6 = 1.666666666 (times less)
So, we get 18 hours, multiply it by 1.875 and divide it by 1.666666666
which equals 20.25 hours
So, it seems you were correct on your third try.
Step-by-step explanation:
Given that Li is making beaded necklaces for each necklace, she uses 27 spacers, plus 5 beads per inch of necklace length.
The equation to find how many beads Li needs for each necklace can be obtained as follows:
A. The input variable is the number of inches of the necklace length (x).
B. The output variable is the number of beads Li needs for each necklace (y).
C. The required equation is given by
y = 5x
Answer:
X = 4
Step-by-step explanation:
16x -3 = 12x+13
16x-12x=13+3
4x= 16
x = 16/4
x=4
For this question, we must use BIDMAS
Brackets
Indices
Division
Multiplication
Addition
Subtraction
26.6 x 24.4 / 5.67 x 4.02
First, round all the values to their first significant figure
30 x 20 / 6 x 4
The first occurring operation in BIDMAS is Division
20/6 = 3 1/3
Now do the multiplication
30 x 3 1/3 x 4 = 400
Or you can round to the nearest whole number (although it can be more difficult if doing sums in your head)
27 x 24 / 6 x 4
27 x 4 x 4
27 x 16 = 432
The more accurately you round, the closer the estimation is to the actual answer (≈460)
1 Sig Fig = 400
Whole number = 432