Answer:
a contemptible, socially inept person.
Step-by-step explanation:
Answer:
1) -184
2) 13
-3(
)+4
Step-by-step explanation:
For problem number 1, Let's start by substituting all the x's for -3
So the equation will look like
p(-3)=
-
+7(-3)-10
Now, lets simplify by solving the exponents
First we'll do
which equals -27
Now we'll do
which equals 9
So now our equation looks like
p(-3)=4(-27)-5(9)+7(-3)-10
Now, we are going to multiply all these numbers
First 4(-27) which equals -108
Now -5(9) which equals -45
And finally 7(-3) which equals -21
Now our equation looks like
p(-3)= -108-45-21-10
Now we can solve
-108-45-21-10=-184
Answer:
Option A is correct.
Step-by-step explanation:
We are given:

We need to find the value of a.
The LCM of (2+i) and (3+i) is (2+i)(3+i)

Now rationalize the denominator by multiplying by 5-5i/5-5i

We are given

Now after solving we have:

So value of a = 1/10 and value of b = -1/10
So, Option A is correct.
Answer:
0.726 is the probability that the project will be completed in 33 days or less.
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 30 days
Variance = 25 days
Standard Deviation,

We assume that the distribution of path length is a bell shaped distribution that is a normal distribution.
Formula:

P(completed in 33 days or less)
Calculation the value from standard normal z table, we have,

0.726 is the probability that the project will be completed in 33 days or less.
96,910. Is that what you were looking for?